SCRIPPS
Culver City, CA

 

Project Description
This project “created land”.  An existing soccer field was removed, the subterranean parking structure was installed, and the soccer field re-constructed at grade above.  The school accomplished their goal of adding parking while incurring less cost than purchasing new land. Since this was constructed on a college campus, tight operations were required, traffic control had to be precisely managed, and disruption kept to an absolute minimum. The project was completed ahead of schedule.
Project Environment
Women’s Private College Campus, Claremont, CA
Project Statistics
One-level subterranean parking supporting 250 stalls with a grass soccer field supported deck.
Owner Developer
Scripps College
Budget
$13,000,000
Build Design Team
General Contractor & Lead Design Professional:  DDC Management Services, Amer Soudani

Precast Contractor:  Hanson Structural Precast, Ed Wopschall

Architect:  HNA Pacific Architects, Scott Herman

Structural Engineer:  Saiful/Bouquet Structural Engineers, Y.K. Low